Cyclone Monty

Severe Tropical Cyclone Monty
Cyclone Monty near its peak intensity
Meteorological history
FormedFebruary 23, 2004 (2004-02-23)
DissipatedMarch 3, 2004 (2004-03-04)
Category 4 severe tropical cyclone
10-minute sustained (BOM)
Highest winds185 km/h (115 mph)
Lowest pressure935 hPa (mbar); 27.61 inHg
Category 3-equivalent tropical cyclone
1-minute sustained (SSHWS/JTWC)
Highest winds205 km/h (125 mph)
Lowest pressure933 hPa (mbar); 27.55 inHg
Overall effects
FatalitiesNone reported
DamageMinimal
Areas affectedWestern Australia
IBTrACSEdit this at Wikidata

Part of the 2003–04 Australian region cyclone season

Severe Tropical Cyclone Monty was a powerful category 4 tropical cyclone that formed during late February 2004. Monty was the 6th tropical cyclone and the 3rd Severe tropical cyclone of the 2003-04 Australian region cyclone season. Monty made landfall in a large, sparsely populated region of the Pilbara, Western Australia. Due to the low population, damages inland were not high, although there was major flooding and many roads were impassable because they were flooded or washed away by water. Monty set record high amounts of flooding in some parts of Western Australia.[1]

Meteorological history

Map plotting the storm's track and intensity, according to the Saffir–Simpson scale
  Tropical depression (≤38 mph, ≤62 km/h)
  Tropical storm (39–73 mph, 63–118 km/h)
  Category 1 (74–95 mph, 119–153 km/h)
  Category 2 (96–110 mph, 154–177 km/h)
  Category 3 (111–129 mph, 178–208 km/h)
  Category 4 (130–156 mph, 209–251 km/h)
  Category 5 (≥157 mph, ≥252 km/h)
  Unknown
Storm type
circle Tropical cyclone
square Subtropical cyclone
triangle Extratropical cyclone, remnant low, tropical disturbance, or monsoon depression