Lempster Mountain Wind Power Project

Lempster Wind Farm

43°14′N 72°09′W / 43.233°N 72.150°W / 43.233; -72.150 Lempster Mountain Wind Power Project is a 24-megawatt wind farm, opened in 2008 in Lempster, New Hampshire in the northeast United States. Owned by Iberdrola, it is the first major wind-power installation in the state of New Hampshire.[1]

Located 5 miles from Mount Sunapee, it has 12 wind turbines stretching over several connected ridgelines.

  • Wind turbine tower
    Wind turbine tower
  • Lempster Wind Farm
    Lempster Wind Farm

References

  1. ^ NH Brusiness Review: Wind farm in Lempster picks up steam" Nov. 7, 2008

External links

  • iconWeather portal
  • iconRenewable energy portal
  • Lempster Wind information from Iberdrola