Trailblazer (satellite)

Trailblazer
Mission typeTechnology demonstration
OperatorUS Air Force
MDA
COSPAR ID2008-F01
SATCAT no.noneEdit this on Wikidata
Mission durationFailed to orbit
Spacecraft properties
BusMMB-100
ManufacturerSpaceDev
Start of mission
Launch date3 August 2008, 03:34 UTC
RocketFalcon 1 # 3
Launch siteKwajalein Atoll, Omelek
ContractorSpaceX
Orbital parameters
Reference systemGeocentric orbit (planned)
RegimeLow Earth orbit
 

Trailblazer was a technology demonstration satellite, which was to have been operated by the United States Air Force and the Missile Defense Agency. It was selected for launch under a "Jumpstart" contract, to demonstrate responsiveness, with the final payload being chosen less than a month ahead of the scheduled launch date, and was launched as the primary payload of the third Falcon 1, which failed just over two minutes after launch on 3 August 2008. Two previous Falcon 1 launches also failed to reach orbit, but the fourth succeeded although it only carried a dummy payload.

It was originally built for a canceled MDA project, and was based on a SpaceDev MMB-100 satellite bus. It was launched from Omelek Island, Kwajalein Atoll at 03:34 UTC. Several other payloads were to be launched aboard the same launch vehicle, including two CubeSats for NASA (PRESat and NanoSail-D), and a space burial (Celestis-07) payload for Celestis, which would have remained attached to the launch vehicle in low Earth orbit.

References

  • Spaceflight portal
  • Gunter's Space Page - Trailblazer
  • SpaceX Falcon Rocket: Third Flight the Charm?
  • Trailblazer
  • v
  • t
  • e
SpaceX missions and payloads
Launch vehiclesFalcon 1 missions
Falcon 9 missions
Demonstration
ISS logistics
Crewed
Commercial
satellites
Scientific
satellites
Military
satellites
  • NROL-76
  • X-37B OTV-5
  • Zuma
  • SES-16 / GovSat-1
  • Paz
  • GPS III-01
  • ANASIS-II
  • GPS III-03
  • NROL-108
  • GPS III-04
  • GPS III-05
  • COSMO-SkyMed CSG-2
  • NROL-87
  • NROL-85 (Intruder 13A/B)
  • SARah 1
  • EROS-C3
  • GPS III-06
  • Transport and Tracking Layer (Tranche 0, Flight 1)
  • Transport and Tracking Layer (Tranche 0, Flight 2)
  • 425 Project SAR Satellite
  • SARah 2/3
  • USSF-124
  • 425 Project SAR satellite flight 2
  • Weather System Follow-on Microwave 1
  • NROL-146
  • NROL-186
  • NROL-69
  • Spainsat NG I
  • SDA Tranche 1 Tracking layer T1TL-B
  • SDA Tranche 1 Tracking layer T1TL-C
  • SDA Tranche 1 Tracking layer T1TL-D
  • 425 Project SAR satellite flight 3
  • SDA Tranche 1 Tracking layer T1TL-E
  • SDA Tranche 1 Transport layer T1TR-C
  • USSF-36
  • USSF-31
  • Skynet 6A
  • Spainsat NG II
  • SDA Tranche 1 Transport layer T1TL-F
  • SDA Tranche 1 Transport layer T1TR-A
  • SDA Tranche 1 Transport layer T1TR-E
  • SDA Tranche 1 Transport layer T2TL-A
Starlink
Rideshares
Transporter
Bandwagon
  • 2024
Falcon Heavy missionsStarship missions
  • Ongoing spaceflights are underlined
  • Future missions and vehicles under development in italics
  • Failed missions† are marked with dagger †
  • v
  • t
  • e
Orbital launches in 2008
January
February
March
April
May
June
July
August
September
October
November
December
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ).
Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses).
Stub icon

This article about one or more spacecraft of the United States is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e